Basement excavation

Basement excavation

Basement level floor lowered  about 16" to increase head height, with open connection to ground level above.

Existing Floor Framing

Existing Floor Framing

Painted underside of joists and flooring before sandblasting.

Entry Lobby

Entry Lobby

Fisheye view of double height lobby before installation of stainless steel bridge and channel glass walls.

 

Entry Lobby

Entry Lobby

Second Floor Walkway

Second Floor Walkway

First Floor Lobby Entrance

First Floor Lobby Entrance