Advent Software moved from a slowly evolving floor by floor campus type facility to a 100,000 sqft shell building to allow departments to work more closely with each other and consider future expansion. Adjacencies were a prominent feature in a design where each floor was 40,000 sqft.

Cork circulation routes branch off from a central lobby on each door to support separate office cubes set away from exterior windows. Workstations are set in clusters around each office with varying density, but allow for office privacy.

Key Materials:
• Beech veneer
• cork flooring
• suspended metal ceilings
• exposed tube steel
• acid etched glass

08.jpg
00.jpg
01.jpg
02.jpg
05.jpg
06.jpg
 DESIGN TEAM:  Stephen MacCracken  (Principal)  Daniel Robinson  (Principal) Patrick Whelan William Ho Guillermo Fernandez Elena Tomlinson Kiyomi Koide  CONTRACTOR: CCI  CONSULTANTS: Western Allied (Mechanical) McMillan Electric (Electrical)  FURNITURE CONSULTANT: Page & Moris  PHOTOGRAPHY: Rien Van Rijthoven

DESIGN TEAM:
Stephen MacCracken (Principal)
Daniel Robinson (Principal)
Patrick Whelan
William Ho
Guillermo Fernandez
Elena Tomlinson
Kiyomi Koide

CONTRACTOR:
CCI

CONSULTANTS:
Western Allied (Mechanical)
McMillan Electric (Electrical)

FURNITURE CONSULTANT:
Page & Moris

PHOTOGRAPHY:
Rien Van Rijthoven